Drywalling Installers

Drywalling Installers OLG Pretoria

Drywalling Installers

Drywalling Installers

Drywalling Installers

Drywalling Installers

Mr Malan contacted us to assist with dry wall and installation at Legalcom in Mooikloof as part of their new offices.

He already had a clear picture in mind of the layout required and had plans already drawn up.

The new dry wall was installed in an empty shell of the new offices Mr Malan had build.

The dry wall was fixed to existing wall, pillars and ceiling with standard door frames fitted.

After all dry wall was completed the electrical articulation was completed .

The dry wall was then painted and Belgotex Berberpoint 920 carpets installed.

As can be seen the final product was not only functional but also aesthetically pleasing and fully caters for Mr Malan’s business.

The structure was created from galvanized floor track which was fixed to the floor with nail in screws, aluminium natural anodized wall channel fitted to the ceilings and walls where required and galvanized studs  as per supplier recommendation. Corner sections done with galvanized angle and all secured with drywall screws.

It needs to be noted that accuracy when constructing the structure is of utmost importance. If the structure is poorly constructed the end product will be of poor visual quality.After the drywalling  structure was completed 12.5mm Gypsum board cladding was used.

Windows was fitted using natural anodized aluminium glazing sections, natural anodized beads, bubble gasket and 6.38mm safety glass.

Doors fitted had natural anodized aluminium frames, natural anodized hinges, medium duty hollow core doors and standard lock sets.

Joint was then fiber taped and two coats Rhinoglide applied. Once dry, the joints was sanded to a smooth finish in preparation for painting.

It was an absolutely a pleasure not only meeting Mr Malan but to be honored to do this project for him.

Well done to the team!!!

Below a link with some more information:

Dry Walling installation

We were approached by OLG to assist them with the building of their new training centers. We assisted them with the following..

Supply and install 3.0m Drywalling 89mm System with aluminium head and skirting Paint drywall 1 coat plaster primer and 2 coats low sheen Supply and install laminate with Combi lay Supply and install Dura Turf Supply and install Berber Point 920 Broadloom Supply and install 3.0m Drywalling 89mm System with aluminium head and skirting Supply and install 3.0m corner bead Standard height medium duty semi solid door with standard lockset and 89mm structure door frame and aluminium hinges Standard height medium duty semi solid door with standard lockset and 89mm structure door frame and sliding rail Standard height medium duty semi solid double doors with special lockset and 89mm structure door frame and aluminium hinges, top and bottom bolts Paint existing walls 2 coats low sheen Paint new drywalls 1 coat plaster primer and 2 coats low sheen Supply and install walk in safe door 6mm with double brick frame Supply and install 2 100mm x 100mm sqr tubing per side to bottom of soffit to mount safe door to Supply and install 3.0m Drywalling 89mm System with aluminium head and skirting re-inforced both sides of structure with 0.5mm galvanized sheeting Supply and install flush plastered ceiling with shadow line using 9.5mm Gypsum board, 2 coats Rhinolite with 0.5mm galvanized sheeting Paint security drywall 1 coat plaster primer and 2 coats low sheen Paint security ceiling 1 coat plaster primer and 2 coats low sheen Remove existing connections from Main DB Remove red plug and 4 x 4 boxes mounted above power skirting Remove light switch Remove plug from power skirting Remove network cables Supply and install Sub DB+Main Breaker+Trip Switches Connect Sub DB to Main DB+Main Breaker+Trip Switches Fit double plugs and connect to normal power DB Fit dedicated double plugs and connect to dedicated power DB Connect light to generator power DB Fit single light switch and connect to generator power DB Fit double light switch and connect to generator power DB Fit downlight in bulkheads supplied by client and connect to generator power DB Supply and fit downlight and connect to generator power DB Fit pendant supplied by client, supply light and transformer for each and connect to generator power DB Close openings in Main DB Label all 3 DB’s COC for Main DB COC for Sub DB Supply and install welding plug-input UPS Supply and install welding plug-output UPS Supply and install relay for dedicated and DB Supply and install fluorescent tubes Remove and disconnect existing unused power skirting Remove existing dedicated plugs and terminate connection Supply and install blank cover Fit double plugs and connect to normal power DB Fit dedicated double plugs and connect to dedicated power DB

Customize

Customize

Patterns

  • Pattern 1
    Pattern 2
    Pattern 3
    Pattern 4
    Pattern 5
    Pattern 6
    Pattern 7
    Pattern 8
    Pattern 9
    Pattern 10
    Pattern 11
    Pattern 12
    Pattern 13
    Pattern 14
    Pattern 15
    Pattern 16
    Pattern 17
    Pattern 18
    Pattern 19
    Pattern 20

Typography

Check out more awesome features arrow