Mr Malan contacted us to assist with dry wall and installation at Legalcom in Mooikloof as part of their new offices.

He already had a clear picture in mind of the layout required and had plans already drawn up.

The new dry wall was installed in an empty shell of the new offices Mr Malan had build.

The dry wall was fixed to existing wall, pillars and ceiling with standard door frames fitted.

After all dry wall was completed the electrical articulation was completed .

The dry wall was then painted and Belgotex Berberpoint 920 carpets installed.

As can be seen the final product was not only functional but also aesthetically pleasing and fully caters for Mr Malan’s business.

The structure was created from galvanized floor track which was fixed to the floor with nail in screws, aluminium natural anodized wall channel fitted to the ceilings and walls where required and galvanized studs  as per supplier recommendation. Corner sections done with galvanized angle and all secured with drywall screws.

It needs to be noted that accuracy when constructing the structure is of utmost importance. If the structure is poorly constructed the end product will be of poor visual quality.After the drywalling  structure was completed 12.5mm Gypsum board cladding was used.

Windows was fitted using natural anodized aluminium glazing sections, natural anodized beads, bubble gasket and 6.38mm safety glass.

Doors fitted had natural anodized aluminium frames, natural anodized hinges, medium duty hollow core doors and standard lock sets.

Joint was then fiber taped and two coats Rhinoglide applied. Once dry, the joints was sanded to a smooth finish in preparation for painting.

It was an absolutely a pleasure not only meeting Mr Malan but to be honored to do this project for him.

Well done to the team!!!

Below a link with some more information:

Dry Walling installation

We were contacted by Joggie from AME to assist them with building new Drywalling offices on a mezzanine floor in their warehouse.

Because this is an elevated mezzanine floor in their warehouse we had to us our Scaffolds to build the outside walls. We installed 78 meters 2.7m Drywalling 89mm System with aluminium head and skirting. We also installed 89mm aluminium abutment 2700mm

Furthermore we installed medium duty semi solid doors 2032mm x 813mm with standard lockset and 89mm structure door frame and aluminium hinges.

One medium duty semi solid double door 2032mm x 1600mm with standard lockset and 89mm structure door frame, aluminium hinges and dead bolts was also installed at the boardroom.

Corner Beads were installed on corner walls 30×30 2700mm

All doors were painted with white enamel. All walls were painted 1 coat plaster primer and 2 coats low sheen in the color that the customer chose.

Finally we installed suspended ceiling with white grid, shadow line and vinyl white tiles 1195mm x 595mm suspended from 114mm x 38mm build in trusses.

All electrical work was done by our electrical team and Aircons were installed in all the offices.

It was a pleasure to work for AME and we hope they enjoy their new offices.

Customize

Customize

Patterns

  • Pattern 1
    Pattern 2
    Pattern 3
    Pattern 4
    Pattern 5
    Pattern 6
    Pattern 7
    Pattern 8
    Pattern 9
    Pattern 10
    Pattern 11
    Pattern 12
    Pattern 13
    Pattern 14
    Pattern 15
    Pattern 16
    Pattern 17
    Pattern 18
    Pattern 19
    Pattern 20

Typography

Check out more awesome features arrow